DESCRIPTION
No description to show.
Our Project methodology was governed by the initial Frame, which emphasized the factors that will constrain the potential for economic success in the basin:
- Trap Size
- Large Fetch areas with significant migration focus
- The likely presence of an effective reservoir in the trap
- Water depth
- Depth-to-target
We have parameterized success in the basin at the level of the Play Fairway and Initial Leads.
REQUIREMENTS
No requirements to show.
In-person event requires registration and visa to travel to the country
Modules
No content to show.